Technical Specifications Model: PCD230A101 Part Number: 3BHE022291R0101 Power Supply: DC 9‑36 VDC, dual redundant power input Digital Input: 6 channels galvanic isolated 24 VDC Communication Interfaces: 4‑port Ethernet switch, RS232 interface, three optical fiber communication ports Mounting Mode: Rack plug‑in installation Operating Temperature: 0 ℃ to +60 ℃ Storage Temperature: ‑40 ℃ to +85 ℃ Relative Humidity: 5‑95 %, non‑condensing Protection Class: IP20 Certifications: CE, UL
Functional Features Acquires generator‑side real‑time voltage and current measurement signals. Implements protocol conversion for interconnection between excitation unit and upper‑level automation system. Multiple independent communication ports support optical fiber and electrical signal transmission. Galvanic isolation for digital input channels suppresses industrial site interference. Front‑panel LED array indicates module power‑on, running and communication link status. Built‑in hardware self‑diagnosis monitors internal hardware failure and communication interruption. Supports redundant power supply input to improve system running reliability.
Application Scenarios Spare‑part replacement for PCD230A101 module in ABB UNITROL series generator excitation cabinet. Signal measurement and data gateway for synchronous generator excitation control in thermal power, hydropower generation plants. Hardware maintenance and component renewal of AC800PEC control platform.
Installation Requirements Insert PCD230A101 fully into the designated rack slot and tighten front‑panel locking screw. Connect DC redundant power supply cables to power terminals according to specification. Plug in Ethernet cables and optical fiber jumpers for external system interconnection. Complete protective earthing complying with cabinet grounding specification. Reserve sufficient ventilation clearance around module slot. Ambient operating temperature shall keep within 0 ℃ to +60 ℃ without condensation. Verify measurement acquisition and multi‑port communication function after power‑on commissioning.















There are no reviews yet.